Drainage Questions, Answered
Do I need a building consent for new drainage or stormwater work?
New drainage and significant alterations can require consent, while some repairs and specific types of work may be exempt. Council connection approval, discharge requirements and other permissions can also apply separately. Exempt work still has to comply with the Building Code. We can review the proposed work and help establish the approvals required before excavation starts.
What’s the difference between a stormwater drain and a sewer drain?
Stormwater drainage carries rainwater from roofs and surface areas. Sewer drainage carries wastewater from toilets, showers, sinks and other sanitary fixtures to the public sewer or an on-site wastewater system. They generally need to remain separate. Incorrect connections can overload systems or cause pollution, so additions and alterations need to discharge to the correct approved destination.
Who’s responsible for the pipe between my house and the council connection?
The property owner is generally responsible for the private drainage serving the property, but the exact ownership limit depends on council policy and the connection arrangement. Private pipes can extend beyond the boundary, and shared drains can complicate responsibility. We can help investigate the pipe route and check the relevant council information before recommending work.
How long does a drainage repair or new connection take?
A small accessible repair may take a day, while deeper work, long runs, difficult access or reinstating concrete can take several days or longer. New connections may also need design, approvals and inspections before work begins. We assess the site and explain the programme, likely drainage downtime and reinstatement scope when pricing the job.